RFQ Preparation Checklist
- Provide 2D lamination drawings, stack height, OD/ID, slot geometry, and tolerance notes
- Specify electrical steel grade, thickness, coating, supplier preference, and core-loss target
- Confirm winding method, slot fill target, insulation system, and thermal class
- Define annual volume, sample quantity, tooling ownership, and inspection record expectations
- Share magnetic performance targets, torque ripple concerns, and noise/vibration constraints



